Building North Poles pt. I

I’ve always wanted to add some North Poles to my display, this year when I was looking for some projects in spring I ordered the Holiday Coro Candy Cane Post Topper. These seemed like a pretty simple project, the kit comes with a topper that plugs into simple drainage pipe plus a controller and RGBs for less than $20, this looked like a great bargain. These would also be my first foray into DMX so a chance for me to expand my knowledge of RGB lighting.

Continue reading “Building North Poles pt. I”

Tis the Season

Labour day weekend is traditionally my kick off for working on the display. I usually lock in my layout and get my LOR order in the week before to take advantage of the Light-O-Rama Summer Sale, then I begin converting my sequences to the new layout. This year has been a little different.

Continue reading “Tis the Season”

Christmas 2020 build schedule

This being stuck at home thing has really thrown me off my usual process of creating my build plan. Usually I think about what I want to do, order the pieces when the LOR summer sale is on, then build my work back plan once I know what I am doing.

Continue reading “Christmas 2020 build schedule”

We’re Half Way There

In the famous words of Jon Bon Jovi “Woah, we’re half way there”
Woah, RGB thoughts are in the air. It is the halfway point between turning my lights off on Jan 4th and light up 2020 on Nov 28th.

Continue reading “We’re Half Way There”

And we’re done!

It’s been a long (6 week) build to get all the lights up, with mostly co-operative weather and very few problems, until the final weekend that is. Continue reading “And we’re done!”

Building a Matrix pt. II

Last year I built a matrix with some extra pixel nodes I had. I enjoyed the pixel screen so much I decided to build matrix borders across the front of my property (and maybe sneaking a little over onto the neighbors). I will be adding 2 matrix, one each side of the driveway made up of three sections. Each section will be 50 X 10 pixels, 2 two sections to the right of the driveway and one section to the left.

Continue reading “Building a Matrix pt. II”

Post go live & into the swing of the season with TSO

I had gotten to go live for the light up party but there were still a couple of details to finish up. Then I had an exciting trip to see the Trans Siberian Orchestra planned.

Continue reading “Post go live & into the swing of the season with TSO”

Getting to live

After the final push there wasn’t much left to do to get the show live for our annual light up party.  I’d actually taken Friday afternoon off work to finish any last pieces and work out any bugs but really didn’t need it. Continue reading “Getting to live”

A Rare Opportunity

day I had a rare alignment of some great weather and a 1/2 day with a clear calendar. Since I will be out of town most of next week I decided to take the afternoon off work and crank through some of my outstanding build tasks.  Continue reading “A Rare Opportunity”